2018年10月13日 星期六

Live in Seclusion for New Works


Since the middle of August, I had carried out the extra arrangement and recomposed the previous musical works thoroughly. Indeed, due to the period of new life adaptation, I had removed almost entire unnecessary hobbies in my daily life. However, in order to make the perfect ending of the current staged mission, I started to sort out the works which I hope I could share to the others for proving the effort I had put in. Thus, when I had some progress in dealing with the previous music, I found out the other works in different media as well, such as image and video. The only motivation could urge me to make the attempt might be the great issue I would be interested in. Currently, what I exactly want to do is to try to create the FLASH animation which I hadn’t tried before. 

This time the FLASH work is not independent, instead, it depends upon the music I had composed last year. In the previous experience, I often film the simple video for specific songs. Unfortunately, after graduating from the school, I had lost the sufficient opportunities to gather the actor and worker. As a result, what I could only do is to make the entire video by myself. In fact, there are several types of producing the animation such as the 3D model by 3DsMax or the 2D video by Flash. Considering the limitation of the time I possess, I am only able to choose the Flash if I want to complete the whole task in the following half year.


In the beginning, I have planed the three major stages for this long-term schedule. This first one I am supposed to think about what kinds of scenes I want for particular frame in the music flow. Then, I have to draw the sketch and establish the illustrator file afterward according to the list above. The final one is to take the illustrator file into the Flash and build the animation thoroughly. In the current process, I had completed the first two ones but the last one is the hardest task in the entire plan. There are almost fifty three to four seconds animations I would produce next. I hope I could slow down the tempo when I conduct the next animation establishment. The time is still waiting for us, so completing only one of them in two days is acceptable also. Thus, as the evaluation above, the completion date will be closely to Chinese New Year.

沒有留言:

張貼留言